Power On Sequence for new RXDA chasssis (dec 2020)

Starting in December 2020, Unitrends began issuing a new model of RXDA Archive Chassis.  This chassis has a unique power on sequence that might seem confusing.  This process was included in the packaging with these new units but is also copied here.  


Power up Sequences:

First Use on Power Cord Connection

  1. Plug power cords into rear of unit
  2. Wait until blue info panel blinks on left front of unit (up to 1 min)
  3. Press power button on right of front panel once
  4. Power up should begin in approx 3 seconds

Power Down Sequence:

  1. Hold the power button on the unit.  the blue info button will start to blink after a few seconds
  2. continue holding the power button until the blue light stops blinking
  3. Release the power button
  4. Unit will begin shutdown approx 10 seconds later

After a normal shutdown:

  1. Press power button on right of front panel once
  2. Power up should begin in approx 3 seconds

After a Power Loss event:

If the unit was on when power was lost, it should automatically reboot approx 15 seconds after power is restored.  

Have more questions?

Contact us

Was this article helpful?
0 out of 0 found this helpful

Provide feedback for the Documentation team!

Browse this section